Societe Generale Algeria Solar Banking Agency - Souk ahras
Commissioning: 2023
Installed capacity: 19,62 KWp
Sungy has supplied electricity to the Société Générale bank agency in Souk Ahras using a self-consumption photovoltaic power plant.
The usable surface area on the roof of the bank branch will enable us to install a photovoltaic power plant that will cover 85% of the bank branch's consumption.